Getting Started
Getting started with an ADU project is what many feel is “the fun part” – you’ll think about your goals and the value an ADU will bring, look for design and layout inspiration, and start to figure out what will work on your property.
- Clarify what you want
- Find inspiration
- Estimate project cost
Project Timeline
Getting Started is part of the Planning phase, which typically takes the first 1-2 months. The entire ADU project can take as little as 6 months to complete or as long as 18 months in a larger city or with a complicated project. Check with your city or town’s building department to confirm timeline for your specific project.
FAQs
Here are a few of the most frequently asked questions about getting started:
What’s the difference between a site-built and a prefabricated or manufactured ADU?
There are two types of construction to consider and both have pros and cons, so think about the level of customization you want and how the ADU will work on your property.
Site-built ADUs
Traditionally constructed and built from scratch on your property (AKA “stick-built”), which often slows for a lot of customization and smaller changes throughout construction.
Typical benefits:
- More options for customization
- Can be easier to get financing and permits
- Can be easier to place on unique properties (steep slopes, rocky terrain, small spaces)
- Can typically be paid for phase-by-phase
Prefab, modular, and panelized ADUs
Built in a factory, then shipped to your site and assembled or placed on a foundation. Some companies provide “turnkey” service with support through the entire process (permitting, construction, etc.). If not, you’ll need to hire other professionals to help.
Prefab ADUs are categorized based on how they are built and inspected.
- Partially fabricated (panelized, framing kits) Parts of the ADU are built off site at a factory, and construction follows a traditional site-built pattern. Local inspectors check work at different stages and a local general contractor and their crew are responsible for putting all the pieces together and passing inspections.
- Prefabricated (modular, manufactured, factory-built) The ADU is built and inspected for building code off site at a factory, then delivered and put in place on your property by a crane or tow. Local inspectors only check work like foundation and utility hook-ups. These types are all built similarly but are called different things based on what building code they meet (state, federal, etc.).
It’s important to note that a prefab ADU project may cost the same as site-built ADUs when you factor in transportation, crane, foundation, and sales tax, which can end up being 20-40% of the total cost. When you get in touch with prefab companies, be sure to ask what is included in the price. Some companies do offer a lower price point.
Typical benefits:
- Lower design and engineering costs
- More clarity on what you’ll get in the end
- Faster construction with less on-site disruption
- Quality inspections from the start
- Fewer permits and inspections
What is a “Protected Use ADU”?
State law defines “protected use ADU” (PUADU) as a type of ADU that must be allowed anywhere a single-family home can be built, whether by default or by special permit (note that this law does not apply in Boston). This means a municipality cannot require a special permit, waiver, variance, or other zoning relief or discretionary zoning approval for a PUADU that meets that definition of a Protected Use ADU.
PUADUs can be up to 900 square feet or half the gross floor area of the primary dwelling, whichever is smaller, as long as it can fit on the property and meet local regulations about setbacks and other details.* They must have sleeping, cooking, and sanitary facilities and a separate entrance from the primary home. PUADUs are still subject to State Building Code, Fire Code, Energy Code, Massachusetts Lead Law, and all other state health and safety laws, including the State Environmental Code. Every city or town can set their own rules for setbacks (distance from the property line and other structures) and dimensional standards (including size, height, and lot coverage) as long as those requirements are reasonable in accordance with state law and the ADU regulations. For more information on what dimensional standards and setback requirements can be required for a PUADU, visit Accessory Dwelling Unit (ADU) – FAQs | Mass.gov.
ADUs that do not meet the definition of a PUADU may still be allowed but will likely require additional review and permitting.
* Gross floor area is defined in the ADU regulations as the square footage of all stories of the building, including basements and lofts, but excluding garage parking, attics, enclosed porches, and crawl spaces. You should confirm any calculations or numbers with municipalities’ building department and trusted building advisors.
How long does it take to build an ADU?
Building an ADU is an investment of time as well as money. Outside of Boston, most ADUs take 6-10 months from design through construction. In Boston, the process is more like 10-18 months. Of all ADU types, conversions of existing interior space are generally the fastest.
- Planning (setting goals, learning the rules, budgeting): 1-2 months
- Design: 1-2 months
- Permitting: 1-2 months for a Protected Use ADU (see FAQ: What is a Protected Use ADU?) outside of Boston, 3-8 months for an ADU in Boston
- Construction: 4-6 months

Check with your city or town’s building department to confirm timeline for your specific project.
How much does it cost to build an ADU?
The following are rough estimates for various kinds of projects, including site work and construction:
| Project Type | Typical Cost Range |
|---|---|
| 2BR Detached ADU | $250,000-$450,000 |
| Studio Detached ADU | $200,000-$300,000 |
| 2BR Attached ADU | $235,000-$360,000 |
| Interior Conversion ADU | $120,000-$270,000 |
The final number can vary widely and depends on many factors including:
- ADU size and type
- Design features and fixtures
- Site conditions (slope, fire access, foundation complexity, utility connections)
- Septic and stormwater details
- Geographic location (urban vs. rural, specific location policies)
See the Budgeting page for more detailed information on typical cost ranges and financing.
Do I need to tell my neighbors I’m building an ADU?
In most cases, you’re not required to tell your neighbors about your ADU. But some projects may require a special zoning variance or other permit that could require a public hearing or notice (note: variances and special permits cannot be applied to a Protected Use ADU).
Regardless, it’s always a good idea to communicate with your neighbors early in the process. Your project will run more smoothly if they are kept informed, and they may have great ideas for your project!
If you live in a Neighborhood or Homeowners Association, talk with your representative or board early in the process because they may have guidelines you’ll need to know for design and construction.
Can I build an all-electric ADU? What should I know about it?
There are many benefits to building an all-electric ADU, including improved indoor air quality, lower environmental footprint, and easier integration with renewable energy technology. An all-electric ADU tends to cost less upfront than a similar ADU with a gas hookup, because extending a gas line to an ADU can be expensive and complicated.
You may look into the following technologies for heating, cooking, and hot water in your ADU:
- Air-Source Heat Pumps
- Ground-Source Heat Pumps
- Heat Pump Clothes Dryer
- Heat Pump Water Heater
- Induction Cooking
Building an all-electric ADU also makes you eligible for between $15,000-25,000 in incentives from Mass Save. ADUs that use propane, oil or gas for heating, cooking or hot water are not eligible for incentives. If you want to offset electrical loads with renewable energy, you might be able to add solar panels (see more about solar electricity here).
Am I allowed to build an ADU? How many?
In most parts of Massachusetts, property owners are allowed to build a Protected Use ADU (PUADU) meeting certain characteristics (see FAQ: What is a Protected Use ADU?). You can build a PUADU in any zone where single-family homes are also allowed, including commercial or multi-family districts where you can build a single-family home – meaning you can add an ADU to a single-family home, a duplex, a triple decker, or a multi-family structure.
Your local community may choose to adopt rules that make some of these rules even easier (for instance, they may let you build a larger ADU). If a city or town chooses to allow more than one ADU on a property, it will still always require a special permitting process.
In most of Boston, ADUs converted from space already inside the home can be added to a 1-, 2- or 3-family home without zoning approval but the owner is required to live on the property. Attached and detached ADUs (including conversions of garages) are technically not considered an ADU by the city and require a much more in-depth zoning and permitting review process. See the Boston ADU website for more details.
In the Mattapan neighborhood of Boston, rules are more permissive. Owners of 1-, 2- or 3-family homes in this area can add up to one “non-detached ADU” and one detached ADU to the property (depending on maximum units per lot that are allowed in your subdistrict). The property owner is required to live on the property. “Non-detached ADUs” are defined as attached and/or conversion ADUs that add some footprint onto the existing home through a bump-out, extension, or other kinds of additions. See the City’s Research Your ADU Options page for more details.
How to Get Started
Before You Begin: Make sure you understand the types of ADUs and the other content covered in our ADU 101 for an overview of all you can expect as you build your ADU. You may also want to check out our Glossary to make sure you understand key terms.
You can also begin with a feasibility study to find out what it takes to build an ADU on your specific property. The Massachusetts Housing Partnership ADU Incentive Program is designed to help property owners find Feasibility Study Providers.
In the Pioneer Valley?
Pioneer Valley ADU Accelerator provides technical support for homeowners that are interested in building an all-electric, modular or panelized detached ADU in the Pioneer Valley.
STEP 1 Think About What You Want
Start by thinking about your short- and long-term goals and concerns for your ADU project and what kind of ADU is best for your needs. How do you want to use the ADU now and in the future?
Look for places to get inspired, such as:
- Talk to friends and neighbors who have built an ADU and reach out to any builders or designers you know for a casual chat.
- Use the ADU Wizard to see what fits on your property
- Check out our sample floorplans from dozens of real-world ADUs
- Browse the designs and manufacturers available to the Pioneer Valley ADU Accelerator
- Explore over 100 free downloadable design ideas from the Massachusetts ADU Design Challenge
Keep in mind your plans might change once you hire a professional. It’s also a good idea to talk with your neighbors about your project, and to think about what it means to share space with tenants (and if that impacts your design and layout).
STEP 2 Consider Different Types of Plans
There are multiple kinds of ADUs and ADU plans for you to consider:
Site-Built vs. Prefabricated/Manufactured ADUs
Site-built ADUs (aka “stick-built”) are traditionally constructed and built from scratch on your property, which often slows for a lot of customization and smaller changes throughout construction.
Prefab, modular, and panelized ADUs are built in a factory, then shipped to your site and assembled or placed on a foundation. Some companies provide “turnkey” service with support through the entire process (permitting, construction, etc.). If not, you’ll need to hire other professionals to help.
Ready-Made Plans
Even if you’re planning to build a stick-built/traditionally constructed ADU from scratch (rather than a panelized/prefab/modular ADU), you may be able to save significant time and money by using a design that already exists and potentially customizing it from there. You may see these plans described as “ready-made” or “pre-existing.” The use of these plans still requires site planning and permits regarding the placement, utility connections, foundation, and other elements of the plans that are specific to your property. Outside of Boston, state law requires that site plan review be objective and clear, making it easier for property owners to understand what’s required.
As of April 2026, the State of Massachusetts is preparing to provide high-quality, ready-to-use ADU plans submitted by professionals. Check state websites such as the Executive Office of Housing and Livable Communities’ ADU website for more information.
Before committing to an existing ADU plan, be sure to clarify:
- Limitations on what you can customize in the plan, and
- What permits and planning are still required in your local area.
STEP 3 Visualize Your Space
It’s important to understand the basic shape of your property and what’s currently on it to have a sense of how much space you have to build an ADU. You can look up your property on our ADU Wizard to see the basics, and it’s a good idea to make a basic birds’ eye sketch on scratch paper to add more detail and keep the visual handy through your planning process.
Start by heading to the ADU Wizard and looking up your property via your address, then toggling the map/satellite view in the lower right corner. You can also look up your property on Google Maps or other mapping platforms with satellite photo data. Notice where you see building footprints (including garages or any other accessory buildings), trees, driveways, and other physical features.
Then use a piece of scratch paper to sketch out the basic property shape and add major features or issues with your property: building footprints, porches, trees, driveways and paving, steep slopes, etc. This should help make it clear what space might be available for your project. Don’t worry yet about exact property lines, rules about how far the ADU needs to be from your house, and other details – you’ll use professionals to verify those details along the way.
Resources
STEP 4 Estimate Project Cost
It’s never too early to start thinking about and planning for your project budget. A very rough placeholder for you to use is $250-500 per square foot, including construction and other costs (design, fees, etc.). The real number can vary widely and depends on many factors including:
- ADU size and type
- Design features and fixtures
- Site conditions (slope, fire access, foundation complexity, utility connections)
- Septic and stormwater details
- Geographic location (urban vs. rural, specific location policies)
The following are rough estimates for various kinds of projects, including site work and construction:
| Project Type | Typical Cost Range |
|---|---|
| 2BR Detached ADU | $250,000-$450,000 |
| Studio Detached ADU | $200,000-$300,000 |
| 2BR Attached ADU | $235,000-$360,000 |
| Interior Conversion ADU | $120,000-$270,000 |
See Budgeting & Finance for more about design, permitting, and construction costs and an overview of financing options.