Design
Once you have a sense of what you want to build, know what you can build, and have estimated your budget, you can start designing your ADU, which begins with design inspiration and ends with permit-ready plans.
- Identify what you want in a design
- Understand the design process and professionals involved
- Hire a professional team to create your design
Project Timeline
The Design phase typically takes 1-2 months. The entire ADU project can take as little as 6 months to complete or as long as 18 months in a larger city or with a complicated project. Check with your city or town’s building department to confirm timeline for your specific project.
FAQs
Here are a few of the most frequently asked questions about design:
What’s the difference between a site-built and a prefabricated or manufactured ADU?
There are two types of construction to consider and both have pros and cons, so think about the level of customization you want and how the ADU will work on your property.
Site-built ADUs
Traditionally constructed and built from scratch on your property (AKA “stick-built”), which often slows for a lot of customization and smaller changes throughout construction.
Typical benefits:
- More options for customization
- Can be easier to get financing and permits
- Can be easier to place on unique properties (steep slopes, rocky terrain, small spaces)
- Can typically be paid for phase-by-phase
Prefab, modular, and panelized ADUs
Built in a factory, then shipped to your site and assembled or placed on a foundation. Some companies provide “turnkey” service with support through the entire process (permitting, construction, etc.). If not, you’ll need to hire other professionals to help.
Prefab ADUs are categorized based on how they are built and inspected.
- Partially fabricated (panelized, framing kits) Parts of the ADU are built off site at a factory, and construction follows a traditional site-built pattern. Local inspectors check work at different stages and a local general contractor and their crew are responsible for putting all the pieces together and passing inspections.
- Prefabricated (modular, manufactured, factory-built) The ADU is built and inspected for building code off site at a factory, then delivered and put in place on your property by a crane or tow. Local inspectors only check work like foundation and utility hook-ups. These types are all built similarly but are called different things based on what building code they meet (state, federal, etc.).
It’s important to note that a prefab ADU project may cost the same as site-built ADUs when you factor in transportation, crane, foundation, and sales tax, which can end up being 20-40% of the total cost. When you get in touch with prefab companies, be sure to ask what is included in the price. Some companies do offer a lower price point.
Typical benefits:
- Lower design and engineering costs
- More clarity on what you’ll get in the end
- Faster construction with less on-site disruption
- Quality inspections from the start
- Fewer permits and inspections
Can I use an existing ADU design?
Even if you’re planning to build a stick-built/traditionally constructed ADU from scratch (rather than a panelized/prefab/modular ADU), you may be able to save significant time and money by using a design that already exists and potentially customizing it from there. You may see these plans described as “ready-made” or “pre-existing.” The use of these plans still requires site planning and permits regarding the placement, utility connections, foundation, and other elements of the plans that are specific to your property. Outside of Boston, state law requires that site plan review be objective and clear, making it easier for property owners to understand what’s required.
As of April 2026, the State of Massachusetts is preparing to provide high-quality, ready-to-use ADU plans submitted by professionals. Check state websites such as the Executive Office of Housing and Livable Communities’ ADU website for more information.
Before committing to an existing ADU plan, be sure to clarify:
- Limitations on what you can customize in the plan, and
- What permits and planning are still required in your local area.
Can I build an all-electric ADU? What should I know about it?
There are many benefits to building an all-electric ADU, including improved indoor air quality, lower environmental footprint, and easier integration with renewable energy technology. An all-electric ADU tends to cost less upfront than a similar ADU with a gas hookup, because extending a gas line to an ADU can be expensive and complicated.
You may look into the following technologies for heating, cooking, and hot water in your ADU:
- Air-Source Heat Pumps
- Ground-Source Heat Pumps
- Heat Pump Clothes Dryer
- Heat Pump Water Heater
- Induction Cooking
Building an all-electric ADU also makes you eligible for between $15,000-25,000 in incentives from Mass Save. ADUs that use propane, oil or gas for heating, cooking or hot water are not eligible for incentives. If you want to offset electrical loads with renewable energy, you might be able to add solar panels (see more about solar electricity here).
Can I put an ADU in my garage?
There are options for homeowners to convert legally built structures (garages, barns, art studios) into ADUs, but there are many questions to consider, including:
- How to meet State Building Code and other State Code requirements, like the Fire Code
- Extent and cost of upgrades needed to reuse the existing structure
- Approvals and timelines needed to demolish a pre-existing structure
- Requirements to replace parking spots removed by demolishing existing parking
- Whether the project will be considered a detached or internal conversion ADU and the relevant rules
To qualify as a Protected Use ADU (PUADU), the structure converted must meet the definition of a PUADU (FAQ: What is a Protected Use ADU?).
How large can my ADU be?
For all cities and towns aside from Boston, if your property is located in a zoning district where single-family homes are also allowed by default or by special permit you are allowed to build a Protected Use ADU (PUADU) of up to 900 square feet or half the size of the gross floor area of the primary residence. (For more details about PUADUs and gross floor area definitions, see FAQ: What is a Protected Use ADU?) If there are multiple primary residences on the property, use the largest one for calculations.
- For example, if your primary residence is 1,100 square feet of gross floor area, then the maximum size of your PUADU may be 550 square feet.
- Or, if your primary residence is 1,900 square feet of gross floor area, then the maximum size of your PUADU may be 900 square feet.
Your municipality may allow ADUs larger than what is allowed by the state law, but cannot restrict you to smaller ones as long as your design meets all other requirements for a Protected Use ADU, as defined in the ADU regulations.
In Boston, maximum sizes depend on the rules of your zoning district and ADU type, but a good rule of thumb is that they are limited to 900 square feet or 30-50% of the primary dwelling’s size.
I don’t think I can fit an ADU on my property – what can I do?
If you have a small lot without much open space to place even a small attached or detached ADU, consider creating an internal conversion ADU (see the ADU 101 page). Use existing space within the primary residence, such as a basement or attic, to create an ADU.
Will I need to add parking?
Possibly – rules about parking vary between different cities and towns, but you can’t be required to have more than one space for your ADU. If your property is located within 0.5 miles of a commuter rail station, subway station, ferry terminal or bus station then you can not be required to add an additional parking space for a new ADU. In some circumstances, parking spaces can be tandem (one car in front of another in a driveway or parking space). Talk with local planning staff about what rules apply to your property.
How do I find an architect or designer?
There are a variety of types of designer, and they may be an architect, builder, “designer,” design/build, or a modular/prefab company. If you’re hiring a local individual or team, they’ll likely start the process by visiting your home and talking to you about your ideas and goals. If it seems like a good match, they will prepare a proposal detailing their services and fee. Professionals typically charge for an initial consultation or proposal. Modular manufacturers often have architects in-house and designs pre-made, and it can save money to work directly with a factory or pre-made design. The Boston Society for Architecture website has a directory of ADU professionals.
If you’re in the Pioneer Valley, consider enrolling in our ADU Accelerator program to be connected with local manufacturers of all-electric detached ADUs.
When do I show my designs to local staff?
Once you have a design chosen and customized (if relevant), it’s a great idea to discuss it with Planning staff so they can point out any issues before you prepare your application. Reach out to your town or city’s planning department and ask for information on how to set up a consultation or initial conversation about your ADU designs.
This is also a good time to reach out to utility agencies (water, sewer, gas, etc.) to inquire about their infrastructural requirements and confirm connection and service fees.
How much does it cost to design an ADU?
Design costs cover the work of your architect or designer and may or may not include engineering, surveying, and other professional services necessary to prepare for permitting. Together, these services may total around 10-20% of your total project budget – the exact amount depends on the details of your property and project. See the Budgeting and Finance page for more details.
How to Design Your ADU
Before You Begin: It is helpful to have a clear sense of what you want early in the process. An architect or designer can help you brainstorm, but they cannot start designing until you’ve made basic decisions like the type of ADU you want (see Getting Started) and how many bedrooms it will have.
In the Pioneer Valley?
Pioneer Valley ADU Accelerator provides technical support for homeowners that are interested in building an all-electric, modular or panelized detached ADU in the Pioneer Valley.
STEP 1 Hire Experienced Professionals
Depending on which type of plans you’ve chosen (modular or panelized pre-designed options, State ADU Challenge designs, or fully customized designs that will be site-built), you’ll need to hire professionals to help you through the process.
Your team may include one or more of the following:
- Licensed architect or designer to design your ADU and potentially see you through permitting and construction
- Engineers and specialty consultants (examples: septic consultant, landscape architect)
- Licensed contractor to build your ADU
- Design/build company that designs and builds your ADU
- Modular/prefab company who sells preset designs for modular/prefab homes or builds custom based on your desired design
Bringing on a professional early in the process is often key to getting your ADU approved quickly, managed efficiently, and built cost-effectively. Relevant experience and fit are critical, and it’s important to look at their past work and check references.
In the Pioneer Valley?
Our ADU Accelerator provides a choice of modular/prefab companies and designs. Check out the accelerator page to see if you’re eligible and view the list of professionals.
State ADU Plans
As of April 2026, the State of Massachusetts is preparing to provide high-quality, ready-to-use ADU plans submitted by professionals. Check state websites such as the Executive Office of Housing and Livable Communities’ ADU website for more information.
STEP 2 Choose or Create Initial Design
Once you have your team in place, you will work with them to design your ADU. All projects typically include a professional surveyor making complete, accurate technical drawings of your property and various features, including property boundaries and physical characteristics (trees, buildings, driveways, etc.). This helps you and your team know where the ADU can be placed, how large it can be, and any potentially complex issues you’ll need to address. You can find some initial assessment of these issues by looking up your property using our ADU Wizard.
- For prefab/modular/panelized designs, the process will depend somewhat on the number of designs/models and the level of customization available to your project. You will meet with your professional team to discuss your site and what options you have.
- For site-built designs, the process typically starts with considering size, use, layout, specific project needs (storage, laundry room, etc.), architectural style, and privacy. Your designer will create conceptual drawings including the potential ADU and its relationship to the main house and other features. They will then lead you through a decision-making process to confirm a main concept (size, orientation, etc.) and start making more detailed plans.
Once you have an initial design, it’s a good idea to discuss it with local planning staff so they can point out any issues before submitting your permit application. Your design team can attend this meeting to clarify drawings and help you understand requirements.
If you haven’t already, this is also a good time to reach out to utility service providers (water, sewer, gas, etc.) to confirm your design meets their requirements.
STEP 3 Finalize Your Plan
After you’ve made decisions about your initial designs and received feedback from local staff, your design team will work through any required changes and prepare the permit application (see Permitting).
At this point you can also get construction drawings from your designer that you could use to get construction bids from potential contractors. If you work with a modular/panelized manufacturer and builder, you can refine finishes so you have a very accurate price estimate.
Resources for Design
Navigate Your ADU Process
← Budgeting & Finance
Estimate costs and find funds
Permitting →
Refine design and get permits