ADU 101
Let’s start from the beginning!
What is an ADU?
Accessory dwelling units (ADUs), also known as granny flats, casitas, in-law units, or backyard cottages, can come in many shapes and sizes and serve many different needs. ADUs are always a self-contained home with a kitchen, a bathroom, a place to sleep, and a separate entrance from the primary home. They can range from small studios under 500 square feet to larger spaces with multiple bedrooms.
Hot tip: Outside of Boston, ADUs of up to 900 square feet or half the size of the primary residence (whichever is smaller) are allowed on properties where single-family homes are allowed.
Types of ADUs
ADUs do not always fit neatly into one category – like an attached ADU made from converted space, for instance.
Detached ADU
New freestanding structure separate from the main home, like a backyard cottage.
Detached ADU Pros and Cons
Pros
- Provides the most privacy between the main home and ADU
- Lots of flexibility in design, including the use of prefab options (FAQ: What is the difference between a site-built and a prefabricated or manufactured ADU?)
- Lower construction impact on the main home
- Higher potential rental income
Cons
- Usually the most expensive option
- Highest cost and more difficult to add new utility connections
- Takes up more space in your yard
Attached ADU
New structure (may include some converted space) sharing at least one wall with the main home.
Attached ADU Pros and Cons
Pros
- Lower cost for utility connections and upgrades
- Takes up less space in your yard
- May blend in better with the main home
- Easy access for a caregiver or loved one
- May have lower construction impact on neighbors
Cons
- Probably requires a custom design (can’t use a ready-made plan or prefab unit)
- Less privacy between the main home and ADU (sounds and smells may be more noticeable and you may have to share outdoor space)
- Can be challenging to find a good place to connect to the main home
- Construction will likely impact the main home
- If attached to a duplex, may trigger requirements for indoor sprinklers
Internal/Conversion
Existing space in the main home or on the property (bedroom, basement, attic, detached garage) converted to an ADU.
Conversion ADU Pros and Cons
Pros
- Usually the lowest cost option, especially if converting existing living space
- Usually lower cost for utility connections and upgrades
- May have fewer or lower overall fees
- Takes up less yard space
- May blend in better with the main home
- May have lower construction impact on neighbors
Cons
- Can be challenging and costly if significant upgrades are necessary, such as bringing a space up to code
- Less flexibility in design
- Potential loss of existing living space (bedrooms, etc.) or storage space (garage, basement, attic)
- Construction can impact the main home, especially if you convert existing living space
- May require upgrades to the whole house (talk to local staff if you want to convert more than 50% of the main home)
- If inside a duplex, may trigger requirements for indoor sprinklers
Not an ADU
RVs, tiny homes on wheels, yurts, and storage structures are usually not considered ADUs. Manufactured housing may be an ADU if the manufactured house is on a permanent foundation, connected to utilities, and meets State Building Code requirements. Check with local building or planning staff to confirm what structures on your property may be permitted as an ADU.
Why Build an ADU?
Building an ADU is an investment in your property, your family, and your community. ADUs often provide homes for the local workforce and small families who have difficulty finding local housing that meets their needs. For homeowners, there are many reasons to build an ADU — rental income, safe and convenient housing for relatives, flexibility over time, and many others.
Housing for Loved Ones
Create a safe and stable space for adult children, aging relatives, or family members with disabilities, right on your property.
A home as you age
An ADU can provide a comfortable, accessible home for aging parents or yourself as you age—close to family, but with privacy and independence.
Rental Income
Earn additional income to support your retirement, property taxes, or unexpected expenses—whether renting the ADU or your main home.
Property Investment
An ADU can increase the resale value of your property, especially as the need for smaller housing increases.
Extra Hands
An ADU can bring extra help and security to your property, whether you’re traveling or aging in place.
Community Support
Provide local housing for families, workers, and others who might struggle to find something local.
Environmental Impact
Smaller, all-electric homes require fewer resources and encourage walkability for local families and workers.
Flexible Space
The use of your ADU can change with you and your family over time.
FAQs
Here are a few of the most frequently asked questions about ADUs:
What’s the difference between a site-built and a prefabricated or manufactured ADU?
There are two types of construction to consider and both have pros and cons, so think about the level of customization you want and how the ADU will work on your property.
Site-built ADUs
Traditionally constructed and built from scratch on your property (AKA “stick-built”), which often slows for a lot of customization and smaller changes throughout construction.
Typical benefits:
- More options for customization
- Can be easier to get financing and permits
- Can be easier to place on unique properties (steep slopes, rocky terrain, small spaces)
- Can typically be paid for phase-by-phase
Prefab, modular, and panelized ADUs
Built in a factory, then shipped to your site and assembled or placed on a foundation. Some companies provide “turnkey” service with support through the entire process (permitting, construction, etc.). If not, you’ll need to hire other professionals to help.
Prefab ADUs are categorized based on how they are built and inspected.
- Partially fabricated (panelized, framing kits) Parts of the ADU are built off site at a factory, and construction follows a traditional site-built pattern. Local inspectors check work at different stages and a local general contractor and their crew are responsible for putting all the pieces together and passing inspections.
- Prefabricated (modular, manufactured, factory-built) The ADU is built and inspected for building code off site at a factory, then delivered and put in place on your property by a crane or tow. Local inspectors only check work like foundation and utility hook-ups. These types are all built similarly but are called different things based on what building code they meet (state, federal, etc.).
It’s important to note that a prefab ADU project may cost the same as site-built ADUs when you factor in transportation, crane, foundation, and sales tax, which can end up being 20-40% of the total cost. When you get in touch with prefab companies, be sure to ask what is included in the price. Some companies do offer a lower price point.
Typical benefits:
- Lower design and engineering costs
- More clarity on what you’ll get in the end
- Faster construction with less on-site disruption
- Quality inspections from the start
- Fewer permits and inspections
What is a “Protected Use ADU”?
State law defines “protected use ADU” (PUADU) as a type of ADU that must be allowed anywhere a single-family home can be built, whether by default or by special permit (note that this law does not apply in Boston). This means a municipality cannot require a special permit, waiver, variance, or other zoning relief or discretionary zoning approval for a PUADU that meets that definition of a Protected Use ADU.
PUADUs can be up to 900 square feet or half the gross floor area of the primary dwelling, whichever is smaller, as long as it can fit on the property and meet local regulations about setbacks and other details.* They must have sleeping, cooking, and sanitary facilities and a separate entrance from the primary home. PUADUs are still subject to State Building Code, Fire Code, Energy Code, Massachusetts Lead Law, and all other state health and safety laws, including the State Environmental Code. Every city or town can set their own rules for setbacks (distance from the property line and other structures) and dimensional standards (including size, height, and lot coverage) as long as those requirements are reasonable in accordance with state law and the ADU regulations. For more information on what dimensional standards and setback requirements can be required for a PUADU, visit Accessory Dwelling Unit (ADU) – FAQs | Mass.gov.
ADUs that do not meet the definition of a PUADU may still be allowed but will likely require additional review and permitting.
* Gross floor area is defined in the ADU regulations as the square footage of all stories of the building, including basements and lofts, but excluding garage parking, attics, enclosed porches, and crawl spaces. You should confirm any calculations or numbers with municipalities’ building department and trusted building advisors.
How long does it take to build an ADU?
Building an ADU is an investment of time as well as money. Outside of Boston, most ADUs take 6-10 months from design through construction. In Boston, the process is more like 10-18 months. Of all ADU types, conversions of existing interior space are generally the fastest.
- Planning (setting goals, learning the rules, budgeting): 1-2 months
- Design: 1-2 months
- Permitting: 1-2 months for a Protected Use ADU (see FAQ: What is a Protected Use ADU?) outside of Boston, 3-8 months for an ADU in Boston
- Construction: 4-6 months

Check with your city or town’s building department to confirm timeline for your specific project.
How much does it cost to build an ADU?
The following are rough estimates for various kinds of projects, including site work and construction:
| Project Type | Typical Cost Range |
|---|---|
| 2BR Detached ADU | $250,000-$450,000 |
| Studio Detached ADU | $200,000-$300,000 |
| 2BR Attached ADU | $235,000-$360,000 |
| Interior Conversion ADU | $120,000-$270,000 |
The final number can vary widely and depends on many factors including:
- ADU size and type
- Design features and fixtures
- Site conditions (slope, fire access, foundation complexity, utility connections)
- Septic and stormwater details
- Geographic location (urban vs. rural, specific location policies)
See the Budgeting page for more detailed information on typical cost ranges and financing.
What do I do first to build an ADU?
This site takes you through the ADU process step-by-step, from initial inspiration to construction and renting.
We recommend starting these first steps:
- Use our ADU Wizard by putting in your address and seeing what’s possible. If your property is in the Pioneer Valley, you may be eligible for our program providing professional technical assistance. See program details.
- Read our Getting Started page and then walk through the pages of this site one-by-one for a detailed guide on what to do next.
- Consult with your city or town’s planning and building departments to better understand your local rules.
- Speak to a trusted legal, real estate, or building adviser to understand what options might be available to you.
Can I build an all-electric ADU? What should I know about it?
There are many benefits to building an all-electric ADU, including improved indoor air quality, lower environmental footprint, and easier integration with renewable energy technology. An all-electric ADU tends to cost less upfront than a similar ADU with a gas hookup, because extending a gas line to an ADU can be expensive and complicated.
You may look into the following technologies for heating, cooking, and hot water in your ADU:
- Air-Source Heat Pumps
- Ground-Source Heat Pumps
- Heat Pump Clothes Dryer
- Heat Pump Water Heater
- Induction Cooking
Building an all-electric ADU also makes you eligible for between $15,000-25,000 in incentives from Mass Save. ADUs that use propane, oil or gas for heating, cooking or hot water are not eligible for incentives. If you want to offset electrical loads with renewable energy, you might be able to add solar panels (see more about solar electricity here).
Am I allowed to build an ADU? How many?
In most parts of Massachusetts, property owners are allowed to build a Protected Use ADU (PUADU) meeting certain characteristics (see FAQ: What is a Protected Use ADU?). You can build a PUADU in any zone where single-family homes are also allowed, including commercial or multi-family districts where you can build a single-family home – meaning you can add an ADU to a single-family home, a duplex, a triple decker, or a multi-family structure.
Your local community may choose to adopt rules that make some of these rules even easier (for instance, they may let you build a larger ADU). If a city or town chooses to allow more than one ADU on a property, it will still always require a special permitting process.
In most of Boston, ADUs converted from space already inside the home can be added to a 1-, 2- or 3-family home without zoning approval but the owner is required to live on the property. Attached and detached ADUs (including conversions of garages) are technically not considered an ADU by the city and require a much more in-depth zoning and permitting review process. See the Boston ADU website for more details.
In the Mattapan neighborhood of Boston, rules are more permissive. Owners of 1-, 2- or 3-family homes in this area can add up to one “non-detached ADU” and one detached ADU to the property (depending on maximum units per lot that are allowed in your subdistrict). The property owner is required to live on the property. “Non-detached ADUs” are defined as attached and/or conversion ADUs that add some footprint onto the existing home through a bump-out, extension, or other kinds of additions. See the City’s Research Your ADU Options page for more details.
Can I rent my ADU as an AirBnB or other short-term rental?
Rules about short-term rentals (AirBnBs and VRBOs) vary between different towns and cities. Check with your local planning staff about what’s allowed.
Can I rent out my ADU?
Yes! Renting out your ADU is a great way to generate additional income and provide housing for your community. For more information and support, see Move-in & Renting.
Note that short-term rentals (AirBnBs and VRBOs) may not be allowed in your location or may be subject to additional regulations.
Ready to ADU?
Explore this website phase-by-phase and learn about all the steps of an ADU project.
Getting Started →